OKEA acquired its interests in the Draugen and Gjøa offshore fields in Norway for 4.52 Billion NOK (US$526 million) from Shell in 2018.ĭraugen achieved peak output of about 225 000 bopd in 2001. The platform topsides stand on a concrete gravity-based structure. The Draugen wind farm project also fits well with Odfjell Oceanwind`s long term strategy to become a leading global floating wind farm O&M and technology provider”, says Odfjell Oceanwind CEO Per Lund.ĭraugen field started producing oil in October 1993, via an integrated production, drilling and quarters Draugen platform. Expected completion of the Draugen project is in the first quarter of 2027. By doing this, the reservoir pressure was maintained while also pushing the oil towards the middle of the field, where the platform is located. We installed water injectors at each end of a long and fairly narrow field. “We look forward to further exploring this exciting opportunity in close collaboration with OKEA and TrønderEnergi. This key decision was already in Draugen’s Plan for Development and Operation (PDO), submitted in 1988. The study will include early-stage technical, economical and regulatory evaluations, as well as the potential impact on the environment and climate," the company added. The oil field is named after the Draugen Platform, which is the hub of operations. A plan for development and operation was approved in 1988, and production started in 1993. "The wind farm may also serve the purpose of a flexible storage location for Odfjell Oceanwind’s Mobile Offshore Wind Units (MOWUs), producing renewable energy in between contract periods for off-grid applications. The Draugen oil field was discovered in 1984 by Shell. There are still considerable remaining reserves to be produced. Draugen is a world-class field and has been since first oil in 1993. Tor Bjerkestrand is managing operations on Draugen from his home office. The working uid selected was Cyclopentane and ORC with optimal conguration was discovered according to the vapor saturation. To operate a platform is a jig-saw puzzle where all the pieces must always be in place crisis or no crisis. 12 to conduct an exergetic analysis related to 2nd law of thermodynamic. "The intention of the potential wind farm is to provide renewable power to the Draugen platform and utilize the Draugen infrastructure, including the planned power from shore cable," Odfjell Oceanwind said. Besides the Draugen offshore oil and gas platform, ORC had been utilized on a Brazilian oating oil platform by Barrera et al. The Draugen oil field sits in about 250 meters of water, and is located around 150 kilometers north of Kristiansund. It is developed with a concrete platform with one leg and several underwater installations. The news was shared by the recently formed floating wind tech developer Odfjell Oceanwind which said Friday it had entered into a Memorandum of Understanding with OKEA and the utility company TrønderEnergi to jointly evaluate the potential of developing a floating offshore wind farm connected to the Draugen platform. The Draugen field is one of the largest oil fields on the Norwegian continental shelf and the first one that came into production in the Norwegian Sea. Okea is headquartered in Trondheim, Norway.Norwegian oil and gas company OKEA, the operator of the giant Draugen platform off Norway, is working on a project that will see the offshore oil production facility powered by floating wind turbines. It operates with additional offices in Kristiansund, Bergen, Stavanger, and Oslo, Norway. Aker Solutions has signed a contract with OKEA for the Draugen electrification project in the Norwegian Sea, following a Letter of Intent (LoI) from December 2022. Its assets production ownership interest comprises of Draugen, Gjoa, Ivar Aasen, and Yme. Okea has partnered with Seacrest Capital Group to develop a portfolio of oil production assets. Draugen was discovered in 1984, and the plan for development and production (PDO) was approved in 1988. It also develops discovered oil fields on the Norwegian continental shelf by applying affordable, modern, and practical solutions, among others. The company provides services such as oil and gas exploration, production, and development of oil and gas-producing properties across Norway. Based on economic assumptions, production will continue until the field reaches its economic limit in 2033.Ībout Okea OKEA AS (Okea) is an explorer and developer of oil and gas. person Finn Harald Sandberg, Norwegian Petroleum Museum. Production from Draugen The Draugen conventional oil field recovered 93.96% of its total recoverable reserves, with peak production in 2001. The gold standard of business intelligence.įield participation details The field is owned by M Vest Energy, Okea and Petoro.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |